| Type | Last Date | Due Date / Window Dates | Postponed | Status |
|---|
| Hull |
| Hull Continuous Survey | 08 Nov 2012 | 08 Nov 2017 | | |
| Hull Annual Survey for Renewal | 08 Nov 2012 | 08 Nov 2017 | | |
| Hull Annual Survey | | 08 Aug 2013 - 08 Feb 2014 | | |
| Annual Survey of structure | | 08 Aug 2013 - 08 Feb 2014 | | |
| Hull Intermediate Survey | | 08 Aug 2014 - 08 Feb 2016 | | |
| Periodical Bottom Survey in Dry Dock | 29 Aug 2012 | 29 Aug 2015 | | |
| Machinery |
| Machinery Continuous Survey | 08 Nov 2012 | 08 Nov 2017 | | |
| Machinery Annual Survey for Renewal | 08 Nov 2012 | 08 Nov 2017 | | |
| Machinery Annual Survey | | 08 Aug 2013 - 08 Feb 2014 | | |
| Portside Tailshaft Complete Survey | 09 Nov 2007 | 09 Nov 2017 | | |
| Portside Tailshaft Modified Survey | 31 Aug 2012 | | | |
| Starboard Tailshaft Complete Survey | 09 Nov 2007 | 09 Nov 2017 | | |
| Starboard Tailshaft Modified Survey | 31 Aug 2012 | | | |
| Boiler |
| Boiler Certificate Class Renewal Survey | 08 Nov 2012 | 08 Nov 2017 | | |
| Boiler Annual External Survey | | 08 Aug 2013 - 08 Feb 2014 | | |
| Aux. Oil-Fired Boiler 1 Internal & External Survey | 31 Aug 2012 | 31 Aug 2015 | | |
| Aux. Oil-Fired Boiler 2 Internal & External Survey | 31 Aug 2012 | 31 Aug 2015 | | |
| Aux.Exhau. Gas Boiler 1 Internal & External Survey | 31 Aug 2012 | 31 Aug 2015 | | |
| Aux.Exhau. Gas Boiler 2 Internal & External Survey | 31 Aug 2012 | 31 Aug 2015 | | |
| Automation |
| Automated Installation Class Renewal Survey | 08 Nov 2012 | 08 Nov 2017 | | |
| Automated Installations Annual Survey for Renewal | 08 Nov 2012 | 08 Nov 2017 | | |
| Automated Installations Annual Survey | | 08 Aug 2013 - 08 Feb 2014 | | |
| Centralized Navigation Control Installation |
| Centralized Navigation Control Renewal Survey | 08 Nov 2012 | 08 Nov 2017 | | |
| Centralized Navigation Control Annual Survey | | 08 Aug 2013 - 08 Feb 2014 | | |
| Load Line |
| Load Line Periodical Survey | 08 Nov 2012 | 08 Nov 2017 | | |
| Load Line Annual Survey | | 08 Aug 2013 - 08 Feb 2014 | | |
| ILO 152 Cargo Gear |
| ILO 152 Cargo Gear Periodical Survey | | 23 Aug 2015 | | |
| ILO 152 Cargo Gear Annual Survey | 11 Oct 2011 | 11 Oct 2012 | | Overdue |
| Item No. | Coeff. | Item Description | Due Date | Last-C/Eng |
|---|
| Hull |
| 29 | 15 | HFO day tank R030204, SB, fr.24-30 survey | 28 Aug 2013 | |
| 33 | 15 | HFO settling tank R030202, SB, fr.18-24 survey | 28 Aug 2013 | |
| 45 | 15 | MDO day tank R030205, fr.23-30 survey | 28 Aug 2013 | |
| Machinery |
| 21 | 5 | ME1 Crankshaft deflection, foundation bolts, chockings | 28 Aug 2013 | |
| 24 | 5 | ME1 FO injection pumps, piping and valves | 28 Aug 2013 | |
| 55 | 5 | ME2 Crankshaft deflection, foundation bolts, chockings | 28 Aug 2013 | |
| 58 | 5 | ME2 FO injection pumps, piping and valves | 28 Aug 2013 | |
| 97 | 5 | Circ water pump 1 to Esb. 1 | 06 Nov 2013 | |
| 100 | 10 | Sprinkler pump unit el. control panel | 06 Nov 2013 | |
| 101 | 5 | Sprinkler pump 1 | 06 Nov 2013 | |
| 114 | 5 | Cooling water transfer pump | 06 Nov 2013 | |
| 138 | 5 | AC Chiller Carrier 1 | 06 Nov 2013 | |
| 164 | 5 | Drencher pump 1 | 06 Nov 2013 | |
| 170 | 5 | Fire pump 1 | 06 Nov 2013 | |
| 178 | 5 | Boiler feed water pump No. 1 to boiler 1 | 06 Nov 2013 | |
| 196 | 10 | Oily bilge pump | 06 Nov 2013 | |